Heavy Duty Support Shoring System Steel Props Acro Jack Jack Base Prop Support Shoring Prop Adjustable Steel Prop Jack Prop for Scaffolding Formwork
Overview Product Description Adjustable Steel PropsAdjustable steel prop is frequently used in formwork and construction
Send your inquiryDESCRIPTION
OverviewBasic Info.
Model NO. | shoring prop |
Packing | 50 Pieces |
Welding | Auto Welding |
Application | Shoring Support |
Factory | Tianjin Friend |
Fitting | G Pin |
Thickness | 1.6-4.0mm |
Inner Tube | 46mm |
Steel Grade | Q235/Q345 |
MOQ | 2000 Pieces |
Length | 2.2-3.9m/3-5m |
Outer Tube | 60mm/56mm |
Surface | Galvanized, Painted, Powder Coated |
Transport Package | in Bundle |
Specification | 2.2-3.9m/3-5.5m |
Trademark | Friend |
Origin | Tianjin, China |
HS Code | 73084000 |
Production Capacity | 40000pieces/Month |
Product Description
Product DescriptionAdjustable Steel PropsAdjustable steel prop is frequently used in formwork and construction to support the floors, ceilings, bridges and beams. With its high load-bearing capacity, it is popular on temporary supports during building repair or alteration work. The advantages are easy to use and time-effective to install, also lower cost. In construction, steel props is used as vertical support in scaffolding as below situation, such as: removing walls, making holes, temporary support for ceiling, beams and so on.
ADJUSTABLE STEEL PROP | |||
Description | Scaffolding fittings steel trench struts and prop jacks for concrete | ||
Tube size | 48/60mm, 40/48mm, 48/56mm | ||
Tube Thickness | 1.6-4.0mm | ||
Adjustable Length | 2400-3900mm, 2000-3500mm, 3000-5500mm or as per your drawing | ||
Surface treatment | Hot dipped Galvanized, Pre galvanized, Painted, Powder coater | ||
Type | Heavy Duty, Light Duty | ||
MOQ | One container | ||
Delivery time | within 20 days | ||
Application | scaffolding and formwork |
Detailed Photos
Our advantage
1) We have our own steel pipe production lines, which provide raw material for steel props. Thus can control the quality and delivery time better.2) Professional welding engineers with more than 10 years welding experience for high quality welding3) QC team to do the inspection for sizes, thickness, welding part and surface during in-line production and final packing4) 15 years experience in Steel Pipe and Scaffolding field, and rcih cooperation experience with heavy buyers5) Fast deliveryPackaging & Shipping
All props are packed in bundles, some with wooden pallet. Or can packed with plastic wrap.
Then how to test the quality of steel props when you purchase the products. Firstly, the raw material of the steel tubes. There are various steel coils for tubes such as Q195, Q235 and Q345 with different mechanical performance. Secondly, the welding parts is significant. The welding lines should be smooth and totally melt with the plate. It's important to check the welding lines in case of incomplete welding and air holes. Thirdly is the surface. Painted, galvanized, powder coated surface are available. Painting is easy to fall off after cracking while the galvanized ones are better on anti-rusting. Powder coated surface is much better than painted, but the cost is much higher.
Company ProfileProduct ParametersFAQ1. Q: What's your MOQ(minimum order quantity)?
A: One full 20ft container, mixed products are acceptable. We can produce as per your quantity based on different products. Please feel free to contact us, let's discuss furtherly. 2. Q: What's your packing methods?
A: Packed in bundle or bulk (customed is accepted). For steel pipes, we pack by steel strips with 61 pieces in bundle. Steel plan, steel frame, and steel prop are packed by steel strips in bundle. Couplers are in pallet. 3. Q: What's your delivery time?
A: 10-30 days after received the advance payment. For stel pipe, we can arrange shipment within 10-20 days usualy we have steel pipe in production line. For steel plank, steel prop and scaffolding frame, which need further welding, it takes 30 days. We will try our best to arrange shippment asap. Also we can arrange partial shipment based on your quantity.4. Q: Are you manufacturer or trader?
A: We are a professional steel product manufacturer with more than 15 years of export experience. We have our own factories, one is for steel pipe, one is for galvanization, another is for scaffolding, such as steel plank, steel prop and steel frame. We have over 100 workers, with 5 welding line. Our products are exporting to Southeast and Mideast Asia, EU market. With our own factories, we can control the production cost and delivery time better. And provide you high quality goods with moderate price.5. Q: Where's your factory?
A: Our factory is in Tianjin city (near Beijing), close to Tianjin Port. Our factory is located in the biggest steel industrial zone in China, with the steel industrial concentration, we can get raw material and fittings very fast, and arrange shipment ealrier.6. Q: Can we visit your factory?
A: Warmly welcome. Once we have your schedule, we will arrange the professional sales team to follow up your case. It is helpful to know better about our factory. We can also do the remote inspection based on current coronavirus situation.7. Q: Can you supply other scaffolding materials?
A: Yes. All related construction materials, such as scaffold tube, steel plank, scaffolding frame. scaffolding couplers. Besides, we can also source for you.
Related Products
-
Comaccord Steel Prop Adjustable Steel Prop Aluminum Formwork Accessories for Construction Slab Formwork and Aluminum Formwork System
-
Hot Sale Carbon Steel Pin Wedge Custom Sizes Good Price Wedge and Pin Solid
-
Reliable Construction Steel Formwork Green Formwork Table Formwork
-
Concrete Wall Tie Aluminum Formwork Accessory Flat Tie Construction Material Wall Flat Tie Fasteners Aluminum Formwork System